2024-2025 Performance Expectations Summary
South Walton Mosquito District - Performance Expectations
(FY 2024–2025)
Overall
The District met or exceeded the vast majority of performance measures across safety, health & environment, operations, administration/finance, public outreach, and training. Notable strengths include high equipment readiness, strong compliance activity, timely constituent response, and comprehensive surveillance. Improvement opportunities are targeted and manageable: a small shortfall in adult mosquito sampling, a missed safety committee meeting during the facility move, two OSHA‑recordable incidents (one lost‑day case), and gaps in event/website metrics.
Safety, Health & Environment
Safety: 11 of 12 monthly safety committee meetings held (one missed during the September building move); 27 safety briefings and 142 safety compliance inspections conducted; annual fire extinguisher inspections completed; two OSHA‑recordable incidents (two workers’ comp cases; one missed day), all documented/investigated.
Health: No human cases of mosquito‑borne disease in SWMD; neighboring counties showed WNV activity (Bay: 1; Escambia: 6; Santa Rosa: 1) for regional context.
Environment: No spills reported; all application equipment calibrated.
Operations — Surveillance & Service
Surveillance: Adult samples collected 2,174 (target 2,200, slightly below); larval samples 285 (target 200, achieved); sample identification within 1 business day achieved; 5 resistance tests performed (target 1); arboviral samples processed 2,496 (target 2,000, exceeded).
Service requests: 188 completed; response SLAs met (contact within 2 business hours, completion within 1 business day).
Operations — Control (Adulticide, Larvicide & Source Reduction)
Adulticide: Missions scheduled per F.S. 5E‑13.036 or heightened vector concern; >90% of scheduled missions completed; equipment operational readiness averaged 95%.
Larvicide: Equipment readiness averaged 85%; ditch/standing‑water treatments executed after >2″ rain and when justified by samples. Source sites: 6,302 inspected (goal 5,000, exceeded) with 2,980 treated (noted as a dry year); inaccessible habitats: 500 inspected (goal 300, exceeded) with 200 treated (dry‑year conditions).
Source reduction ditch system (44 ditches): Equipment readiness averaged 96.75%; 184.36 miles mowed (goal >30 miles); vegetation removal completed; post‑storm inspections conducted; minor and major repairs completed within required windows.
Administration & Finance
Five‑year Capital Improvement Plan updated; detailed and certified budgets submitted and posted; two TRIM meetings and two public workshops held; capital budget maintained and departmental needs assessed. Grants/appropriations tracking in place; a federal‑level pathway was rejected, so the District is pursuing alternative public‑health funding avenues, including AI‑assisted research.
Public Outreach
Board updates: 4 (quarterly). Events: HOA/state parks 3, community 3, schools 1. Social media presence has grown with weekly posts and monthly new content; YouTube has been reviewed for visibility. Assessment gaps: Monthly website traffic not measured (Fail) and event attendee counts not measured (Fail); QR surveys offered to attendees and to teachers to capture feedback.
Training
New‑hire training materials provided; one‑on‑one instruction delivered; classes/tests scheduled; all field employees licensed within one year of hire; continuing education maintained to keep licenses current.
Bottom Line
Operational readiness and compliance are strong, surveillance is robust, and administrative obligations were delivered on time. Focus the next cycle on: closing the small adult‑sample gap, building redundancy so safety meetings are never missed during transitions, formalizing outreach analytics (web and event attendance), and diversifying funding options after the federal‑level setback.
South Walton Mosquito District Performance 24-25 Final.pdf
